My first post here.
My son and I are about to move the recently purchased FP2NC int our workshop. All has to go down a hole (access hatch) of 1020 x 1250 mm hole. To make it worse, the hole can be accessed through a garage, that has only 2140 mm height. The door is even less.
I have installed a hoist attachment point that can handle up to 2000 kg. We have a suitable chain lift (2000kg, some hand winches (900 kg), lifting belts of various lengths, all 3000 kg, ratchet straps, a workshop crane (max 2000 kg) and a pallet trolley.
The parts that need to go down the hole are:
We will shoot a ton of pictures, in order to get it all back together when in the workshop. We have no problem to provide the here
greez chris
![Click image for larger version.
Name: DSC_9376.jpg
Views: 10
Size: 96.4 KB
ID: 280489]()
![Click image for larger version.
Name: DSC_9375.jpg
Views: 11
Size: 92.4 KB
ID: 280488]()
![Click image for larger version.
Name: DSC_9377.jpg
Views: 10
Size: 90.6 KB
ID: 280490]()
My first post here.
My son and I are about to move the recently purchased FP2NC int our workshop. All has to go down a hole (access hatch) of 1020 x 1250 mm hole. To make it worse, the hole can be accessed through a garage, that has only 2140 mm height. The door is even less.
I have installed a hoist attachment point that can handle up to 2000 kg. We have a suitable chain lift (2000kg, some hand winches (900 kg), lifting belts of various lengths, all 3000 kg, ratchet straps, a workshop crane (max 2000 kg) and a pallet trolley.
The parts that need to go down the hole are:
- Main machine, with following part dismounted:
- "Flip head":
- I think the cable on top of the spindle is the power to the spindle motor, am I right?
- I think, removing the flip head should not be too complicated. Just secure it by crane, remove the screws, the guide behind the flip head and it should come off. Am I right?
- splash cabinet, should come off downwards from the table
- standard table, secure by crane, remove screws and we should be done
- handles to manual wheels or wheels as a hole
- x-axis motor, previous owner has done it before and will help, so should be not a big deal
- We might have to till the machine by some 30 to max 45°. Will this cause any problem (oil baths?)?
- complete dialog 4 control system
- Seems to be a major PITA
- There are connectors in the electro cabinet, but none on the machine.
- has anyone done it before?
- "Flip head":
- electro cabinet, I guess, should not be a big issue, as there are connectors
We will shoot a ton of pictures, in order to get it all back together when in the workshop. We have no problem to provide the here
greez chris